InteriorFit the dashhboardMount the dashMount the T-Pull handle for the fire extinguisherbuy and fit a working flasher relayFit (Temporary) buttons for dip/mains and hornMake and fit temporary shift leverFit the heater hose from the dash to the heaterFit the heater hose from the heater to the driver footwell (Exhaust should keep the passenger warm.)Fit a working switch for the heater fanFit the intercomOrder and fit switch for wipersStick down carpetingCarpet around the windscreen aperture- Engine:
- Make an airbox to get through SVA
- Adapt existing air filter to sit 180 degrees from its current location and make hole in bonnet
- Remove AIS system and turn it into a breather system
Orderand fit a catch tank- Change the O-Ring on the sump for a yamaha part
- Order and fit alloy tubes as current ones seem to be porous
- Bodywork:
Glue rear lights in place- Use some PU to fill any gaps
Fit front air dam- Buy and fit some mirrors
- Wash clean and polish
Buy and fit rear diffuserFit side repeaters- Windscreen:
- Buy and fit windscreen
Fit windscreen wipers- Fit washer nozzle
- Brakes:
- Set the brake bias
- weld up the bias bar for IVA
- Remove the bias bar adapter
- Wheels
- Balance the wheels as a couple of the sticky weights came off
- Fit all the wheel nuts, and cut down the front studs if required
- Suspension
Book and appointment to get suspension set up and corner weighted
Friday, August 20, 2010
Fury Todo List
Its mainly little jobs now, in no particular order these are:
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment